IndustrialBase MES
·
Plant 03 — Chonburi
LIVE
Day Shift · 08:00–20:00
OEE
85.4%
Status: Good
Energy Cost Today
฿41,000
Target ฿48,500 · −15.5%
Production Output
3,200 / 5,000
Units · 64.0% of daily target
Machines Running
6 / 9
1 warning · 1 stopped
Active Alerts
3
2 require attention
2D FLOOR PLAN
Plant 03 · Chonburi · 12,400 m²
Normal
Warning
Stopped
Offline
Assembly
Zone A
12 mach · 42 staff
Paint & Coating
Zone B
6 mach · 18 staff
Quality Control
Zone C
4 mach · 11 staff
Maintenance Bay
Zone D
3 mach · 6 staff
Packaging
Zone E
8 mach · 24 staff
Warehouse
Zone F
2 mach · 8 staff
N↑
CORPORATE BRANCHES
6 Locations
HQ Bangkok
Plant 01
Plant 02
Plant 03
Plant 04
Plant 05
Thailand
ENERGY vs. COST — 7 DAY TREND
kWh
Cost (฿)
20k
15k
10k
5k
Mon
Tue
Wed
Thu
Fri
Sat
Today
PREDICTIVE ALERTS
2 ACTIVE
Zone B · Spray Booth Motor temp 88.7°C — bearing inspection recommended within 48h
10:42
AI Predictive
Zone D · Hydraulic Press P-1 offline — scheduled maintenance in progress
08:15
System
Energy draw 12% above 7-day average — possible air compressor leak in Zone E
07:30
AI Predictive
Zone C · QC Station 3 calibration completed successfully
Yesterday
System
OEE target 85% achieved for Week 17
Yesterday
System
HARDWARE STATUS — REAL-TIME
MQTT/OPC-UA LIVE
all
normal
warning
stopped
offline
ID ↑
Machine
Zone
Status
Protocol
Temp (°C)
RPM
Current (A)
Vibration
Uptime
M-001
CNC Mill #1
Zone A
Normal
MQTT
62.1
2,800
48.2
0.12
14h 22m
M-002
CNC Mill #2
Zone A
Normal
MQTT
58.9
2,800
46.7
0.09
14h 22m
M-003
Robotic Arm R-7
Zone A
Normal
OPC-UA
44.2
—
31.1
0.04
14h 22m
M-004
Spray Booth Motor
Zone B
Warning
MQTT
88.7
1,450
62.4
0.38
09h 14m
M-005
Conveyor Belt B-2
Zone B
Normal
Modbus
41.3
560
18.9
0.07
14h 22m
M-006
Hydraulic Press P-1
Zone D
Stopped
MQTT
24.1
0
0.0
0.00
00h 00m
M-007
Packaging Line #1
Zone E
Normal
MQTT
38.6
1,200
22.4
0.05
14h 22m
M-008
Packaging Line #2
Zone E
Normal
MQTT
39.1
1,200
23.1
0.06
14h 22m
M-009
Cold Storage Unit 1
Zone F
Offline
BACnet
18.4
—
0.0
0.00
00h 00m